Consultative Paper on Draft BERC (Terms and Conditions for Tariff determination from Renewable Energy sources) Regulations, 2025 

Consultative Paper on Draft BERC (Terms and Conditions for Tariff determination from Renewable Energy sources) Regulations, 2025 

POLICY & REGULATIONS

Context & Purpose
Issued by Central Electricity Regulatory Commission (CERC).
Applicable for the control period 01.07.2025 – 31.03.2028.
Covers tariff determination methodology for renewable energy projects under Section 61(h) of the Electricity Act, 2003.
Objective: promote RE investments while ensuring consumer interests.


Applicability
Grid-connected Solar PV, Solar Thermal, Wind (Onshore & Offshore), Small Hydro (≤25 MW), Biomass (Rankine Cycle, Gasifiers, Bagasse Cogeneration), MSW/RDF, and Hybrid Projects.
Excludes projects discovered under competitive bidding (only generic tariff projects covered).
Tariff determination: Generic Tariff (suomotu by CERC) and Project-specific Tariff (on petition).


Tariff Principles
Tariff Period: 25 years (except SHP – 35 years).
Tariff Components: Return on Equity (RoE), Interest on Loan (IOL), Depreciation, O&M Expenses, Interest on Working Capital, Auxiliary Consumption (where applicable).
Discount Rate: 10% for NPV calculations.


Financial Norms
Debt-Equity Ratio: 70:30.
RoE: Pre-tax 16% (grossed up with MAT/Tax rate).
Depreciation: 4.67% p.a. for first 15 years, balance over remaining useful life.
Loan Tenure: 15 years, repayment through equal annual installments.
Working Capital: Normative formula defined for each RE technology.


Technology-specific Norms

Solar PV
CUF: 19% (normative).
Capital Cost: ₹3.8 crore/MW.
O&M: ₹7 lakh/MW (with 3.84% escalation).
Degradation: 0.75% p.a.

Wind (Onshore)
CUF linked to wind zones (Zone I–V).
Capital Cost: ₹6.2 crore/MW.
O&M: ₹10 lakh/MW.

Solar Thermal
CUF: 23%.
Capital Cost: ₹12 crore/MW.
O&M: ₹20 lakh/MW.

Small Hydro (≤25 MW)
Capital Cost: Zone-wise (₹8–10 crore/MW).
CUF: 40%.
O&M: 4% of capital cost.

Biomass (Rankine Cycle, Gasifiers, Bagasse)
Fuel cost indexed annually.
CUF: 80%.
Capital Cost: ₹6.5 crore/MW.

MSW / RDF
CUF: 65%.
Capital Cost: ₹12 crore/MW.
O&M: 7% of capital cost.


Regulatory Process
Draft issued for public consultation.
Stakeholders invited to submit comments/suggestions before final notification.


Significance
Provides a benchmark tariff framework for RE projects outside competitive bidding.
Introduces updated capital cost and CUF norms reflecting current market conditions.
Supports hybrid & new technologies while maintaining investor confidence.