How to Bid for the ₹1.78 Crore Solar Tender

FEATURED

In Short : To design, supply, build, test, and commission an on-grid rooftop solar power plant at Dehradun Airport, the Airports Authority of India (AAI) has released a tender of ₹178.17 lakh (~₹1.78 crore). A two-year defect liability period is followed by an eight-year Annual Comprehensive Operation & Maintenance contract as part of this program, which was introduced on August 19, 2025.

Features of the Project and Timeline for Execution

Rooftop solar panels on several airport buildings are covered by the tender. Design and installation (DSITC) costs ₹155.25 lakh of the estimated ₹178.17 lakh, while the eight-year maintenance package costs ₹22.92 lakh. The project has a strict three-month deadline for completion, a ₹4.66 lakh earnest money deposit, and a tender cost of ₹1,180 (including GST).

Impact and Significance of Clean Energy

Dehradun Airport promotes low-carbon, sustainable operations while lowering its dependency on traditional electricity by implementing rooftop solar. In addition to boosting grid resilience and supporting energy self-sufficiency for vital aviation facilities, this green infrastructure supports the country’s drive for an energy transformation in the transportation and infrastructure sectors.

About the Indian Airports Authority (AAI)

The federal government agency in charge of overseeing the nation’s civil aviation infrastructure is the Airports Authority of India. Beyond airport operations, AAI is becoming more well-known for incorporating renewable energy solutions to improve energy efficiency and decarbonize aviation infrastructure, like solar rooftops.